1、檢查登車(chē)橋http://m.8kvv.com/所有的液壓管道和接頭。管道不能有破損,接頭不能有松動(dòng),必須將所有接頭擰緊。
Ramps Check all hydraulic pipes and fittings. Pipes can not have broken, can not have loose joints, all joints must be tightened.
2、卸下并拆開(kāi)登車(chē)橋下降閥,用壓縮空氣將柱塞吹凈,然后裝入,重新安上。
Remove and disassemble Ramps lowering valve, with compressed air blowing the plunger, then loaded reattach.
3、把登車(chē)橋液壓油放盡棄掉,擰緊接頭取出油過(guò)濾器,洗清后,用壓縮空氣清理干凈,然后放回油箱,并連接好管路。
The hydraulic oil Ramps exhausted discarded, tighten the fitting Remove the oil filter, after cleared with compressed air to clean up, and then back into the tank and connected piping.
4、登車(chē)橋http://m.8kvv.com/全程升起,在這位置時(shí),液壓油面應(yīng)高出箱底40~50毫米。
Ramps full rise, in this position, the hydraulic oil level should be higher than the bottom 40 to 50 mm.